Algeria 300tph aggregate plant

The project consists of the sand production line and the concrete mixing plant. The project uses basalt, local materials, as raw material. The stone and sand produced by the sand production line are delivered directly to the mixing plant by a certain proportion as the main raw materials for next section. The two sections are perfectly combined and of smooth operation.


5-阿尔及利亚1.jpg
5-阿尔及利亚2.jpg

5-阿尔及利亚3.jpg


your contact information