CLIENTS
Sinonine undertakes engineering design and supplies of beneficiation equipments, factory building, non-standard equipment, electrical automation, guides installation and commissioning on site.
FULL STORY
The actual production capacity is 150tpd, and the annual processing capacity of gold ore is 45000Mt. This production line uses flotation method to produce gold concentrate as the final product.
FULL STORY
This mineral processing plant is designed by Sinonine, the design capacity is 1000tpd, and the actual production capacity is 1200tpd. The ore is manganese carbonate.
FULL STORY
The plant is completed by sinonine company, the design scale is 450tpd, the actual production capacity can reach 500tpd, plant operation early production of gold concentrate by flotation method, then design the size of the leaching production line, the final product is gold bullion.
FULL STORY
MORE
your contact information